Protecting floors during move-in begins at the loading point. Walk the route with the delivery team and try the turn into the last room in your head. The tight turn, short landing or change from carpet to timber is often where a wheel runs off a sheet.
Mark finishes and pinch points on one drawing
List the flooring along each section, then mark thresholds, corners, jambs and transitions. Record the widest item, the cart, the load and the number of trips. Ask the building manager which areas must stay accessible and how the route can be protected at openings. Use the elevator delivery route guide where the load goes between floors.
Plan for the first trip and the last
Choose floor protection for each finish and load. A suitably supported corrugated protection board can serve part of a delivery route if its grade and contact arrangement are approved. Fit corner guards where the load may brush a wall. Check joints and changes of level after the first trip, then again before the final removal and handover.
For a quote, send the route width, lengths, wheel load, finishes and delivery dates together. This lets the supplier compare the coverage and format against how the material will be laid.