The tightest point on a delivery route is often the turn into the elevator. A cart clears the door on paper, then the load catches a jamb on the way out. Plan protection for elevator delivery routes as part of the route survey. Start at the loading point and follow the largest intended load all the way to the work area.
Get the building operator’s conditions first
Confirm the approved elevator, when it can be used, the permitted loads and which finishes may be covered. Measure the clear opening, cab dimensions and turning space. Have the operator approve the protection arrangement and any attachment before installation. Leave the operating controls, sensors, tracks and any required clearances available as specified by the operator.
Look at the floor and vertical surfaces separately
Mark the wheel path and turning areas on the floor. Note which door frames and wall corners the load may contact. Check the profile and fit of door jamb protectors on those frames. If considering corrugated protection boards on the floor, confirm the supported load, finish compatibility, how the boards will lie at joints and how the operator wants edges secured.
Send the opening and cab dimensions, finish, proposed carts and delivery period with the enquiry. For the landing and room approach, continue with the move-in delivery route guide.