Planning a Temporary Floor Protection Removal Schedule

Clear carpet protection film being rolled out on a loop-pile carpet
Application illustration

Set a temporary floor protection removal schedule before the first roll is laid. The usable period depends on the covering, anything used to hold it in place, the floor finish and actual exposure. If a fixing has the shorter approved window, schedule that check or removal first.

Make one record per finish and grade

Write down the floor finish, confirmation that it can be covered, covering and tape grades, installation date, and the inspection and removal dates each supplier approves. Mark doorway transitions separately if different material or adhesive is used there. Keep the record where the next shift can find it.

Review the plan when the work changes

Check after plastering, a wet trade, extra cleaning or a change in temperature or sun exposure. Examine the first lifted edge and ask for instructions if you see adhesive transfer, trapped moisture or lifting at a joint. If the programme slips, arrange a review before the original removal date passes.

Compare the selected carpet film and hard surface film by grade and approved surface before using the same schedule. For an attached edge, use the seams and edges guide. If planning around a recently sealed stone floor, check the marble covering conditions before setting the date.