Floor protection by area in hotel renovations begins with the hotel’s daily routes. A polished lobby, a carpeted guest corridor and a room closed to guests can sit on the same delivery path, yet each needs its own covering and edge treatment.
Walk the route with hotel operations
- Lobby and public approach. Confirm the finish and sealer. Mark the entrances, trolley turns and transitions, and agree on where covers can end without leaving a loose edge.
- Guest corridor. Ask which fibre and backing are installed and whether the adhesive has cured. Only consider carpet protection film for an approved carpet and exposure. Check the return trip for lifts, housekeeping carts and door swings.
- Closed work room. Find out which trades will enter after the floor is finished. Protect the route the materials will take, then address cutting, assembly or other heavier work at the source.
Prepare one specification for each zone
Write down the zone, floor finish, activity, estimated covered area and the date the cover must come off. Ask the floor installer to approve the covering that touches the finish and any tape that touches an edge. Use the room turnover dates to plan where you will inspect or replace protection.
For stone in the public areas, see the marble floor guide. If the same corridors will serve several work phases, use the phased hotel renovation plan to schedule the route and decide which protection can move with the trade.